Updated Baseline Cost Model for Hydropower 2025
DATASET XLSM 10.21951/BCM2025/3013764
The “Updated Baseline Cost Model (BCM) for Hydropower (2025)” is an empirical model for estimating the costs of US hydropower projects in six categories (Non-Powered Dam (NPD), New Stream Development (NSD), Canal/Conduit, Pumped Storage Hydro (PSH), Capacity Expansion, Generator Rewind). This update includes an equation for estimating operation and maintenance (O&M) costs, as well as confidence interval calculations for […]