Keyword: Existing Assets
Hydropower Capital and O&M Costs: An Exploration of the FERC Form 1 Data.
Oladosu, G. and Sasthav, C., 2022. Hydropower Capital and O&M Costs: An Exploration of the FERC Form 1 Data. (No. ORNL/TM-2021/2297). Oak Ridge National Laboratory.