Hydropower Baseline Cost Modeling

Publication Date:
January 1, 2015

Citation

O'Connor, P. W, Q. F Zhang, S. T DeNeale, D. R. Chalise, and E. E. Centurion. 2015. Hydropower Baseline Cost Modeling.

D.O.I.

10.2172/1185882

Related Records

Updated Baseline Cost Model for Hydropower, 2023

The "Updated Baseline Cost Model (BCM) for Hydropower" is an empirical model for estimating the costs of US hydropower projects in six categories (Non-Powered Dam (NPD), New Stream Development (NSD), Canal/Conduit, Pumped Storage Hydro (PSH), Capacity Expansion, Generator Rewind).

View Dataset
Name(Required)
This field is hidden when viewing the form
This field is hidden when viewing the form
This field is hidden when viewing the form
This field is hidden when viewing the form
This field is hidden when viewing the form
Used to connect entry data with SiteImprove data