Hydropower Baseline Cost Modeling

Created:

Published:

Last Modified:

October 1, 2024

Citation

O'Connor, P. W, Q. F Zhang, S. T DeNeale, D. R. Chalise, and E. E. Centurion. 2015. Hydropower Baseline Cost Modeling.

D.O.I.

10.2172/1185882

Related Records

Updated Baseline Cost Model for Hydropower, 2023

The "Updated Baseline Cost Model (BCM) for Hydropower" is an empirical model for estimating the costs of US hydropower projects in six categories (Non-Powered Dam (NPD), New Stream Development (NSD), Canal/Conduit, Pumped Storage Hydro (PSH), Capacity Expansion, Generator Rewind).

View Dataset
Name(Required)
Hidden
Hidden
Hidden
Hidden
Hidden
Used to connect entry data with SiteImprove data