Citation
O'Connor, P. W, Q. F Zhang, S. T DeNeale, D. R. Chalise, and E. E. Centurion. 2015. Hydropower Baseline Cost Modeling.
D.O.I.
10.2172/1185882
Related Records
Updated Baseline Cost Model for Hydropower, 2023
The "Updated Baseline Cost Model (BCM) for Hydropower" is an empirical model for estimating the costs of US hydropower projects in six categories (Non-Powered Dam (NPD), New Stream Development (NSD), Canal/Conduit, Pumped Storage Hydro (PSH), Capacity Expansion, Generator Rewind).
View Dataset