Overview
The 2032 Anchor Data Set (ADS) production cost model (PCM) represents the Western Interconnection in a year-10 future and contains the most up-to-date data on transmission topology, loads and resources.
The 2032 Anchor Data Set (ADS) production cost model (PCM) represents the Western Interconnection in a year-10 future and contains the most up-to-date data on transmission topology, loads and resources.